TitleProduct

Nes-100 Series SMPS AC/DC LED Driver Switching Power Supply

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Zhejiang

  • Validity to:

    Long-term effective

  • Last update:

    2017-12-27 23:25

  • Browse the number:

    216

Send an inquiries

Company Profile

Yueqing Winston Electric Co., Ltd.

By certification [File Integrity]

Contact:Mr. Jeff Wong(Mr.)  

Email:

Telephone:

Phone:

Area:Zhejiang

Address:Zhejiang

Website: http://cnwstele.7unite.com/

Product Details

NES-100 Series Switching Power Supply 

1.INPUT:110V or 220V 
2.CE RoHS Approval 
3.Size:159*98*38mm (L*W*H) 
4.2 Year Warranty
 

MODEL

NES-100-5

NES-100-12

NES-100-15

NES-100-24

NES-100-48

DC VOLTAGE

5V

12V

15V

24V

48V

CURRENT RANGE

0 ~ 20A

0 ~ 8.5A

0 ~ 7A

0 ~ 4.5A

0 ~ 2.3A

EFFICIENCY

80%

83%

84%

86%

86%

WAVE & NOISE 

80mVp-p

120mVp-p

120mVp-p

120mVp-p

150mVp-p
ADJUSTABLE RANGE FOR DC VO;LTAGE
±10%

±10%

±10%

±10%

±10%

LINE REGULATION

±0.5%

±0.5%

±0.5%

±0.5%

±0.5%

LOAD REGULATION

±1%

±0.5%

±0.5%

±0.5%

±0.5%

SETUP, RISE HOLD UP TIME 

800ms, 60ms,50ms/230VAC at full load

VOLTAGE RANGE

90~132VAC/180~264VAC by switch 254~370VDC

FREQUENCY RANGE

47 ~ 63Hz

IMPACT CURRENT 

Cold start current 45A/230VAC

WORKING TEMP.

-10 ~ +50ºC

OVERLOAD PROTECTION

105%-160% cut off the output , automatic recovery

OVER VOLTAGE PROTECTION

115%-135%shunt down O/P voltage,re-power on to recover

WITHSTAND VOLTAGE 

I/P-O/P:1.5KV I/P-FG:1.5KV O/P-FG:0.5KV 1minute

ISOLATION RESISTANCE

I/P-O/P, I/P-FG, O/P-FG:500VDC/100M Ohms

DIMENSION

195*98*38mm (L*W*H)

WERIGHT

0.55kg

PACKING 

34*32*24cm/30pcs/17kg
1. All parameters NOT specially mentioned are measured at 230VAC input, rated load and 25oCof ambient temperature.
2. Ripple & noise are measured at 20MHz of bandwidth by using a 12" twisted pair-wire terminated with a 0.1uf & 47uf parallel capacitor.
3. Tolerance : includes set up tolerance, line regulation and load regulation.
4. Line regulation is measured from low line to high line at rated load.
5. Load regulation is measured from 0% to 100% rated load.
6. The power supply is considered a component which will be installed into a final equipment. The final equipment must be re-confirmed that it still meetsEMC directives.

Dimension


More Detail






PS:If you can't find the exact type of your product.Please don't rush to go away.Contact me and your questions will be replied ASAP.Thank you for your time.
 
Our Services
 
1. Prompt reply: Any inquiry or questions would be replied within 24 hours.
2. Quality Product: Manufacture company, each of the products is tested and calibrated.
3. Hospitality: Offer smiling service and your visiting is highly welcomed
4. Fast delivery: delivery time is within 3-7 days usually, other occasion depends on the order qty.

Trade Information
 
Trade Terms FOB,CIF,CFR,EXW,
Payment terms T/T,L/C,Western union,Paypal,Escrow,MoneyGram
Payment conditions 30% deposit in advance,70% balance before shipping.
Delivery time 3-7working days after deposit,2-4 working days for inventory
Packing Neutral carton,Wooden case for large size
Shipping By sea,by air and by express delivery
Payment conditions 30% deposit in advance,70% balance before shipping.
Delivery time 3-7working days after deposit,2-4 working days for inventory
Packing Neutral carton,Wooden case for large size
Shipping By sea,by air and by express delivery