TitleProduct

Portable Well Drilling Rig

  • Price:

    Negotiable

  • minimum:

  • Total supply:

  • Delivery term:

    The date of payment from buyers deliver within days

  • seat:

    Shandong

  • Validity to:

    Long-term effective

  • Last update:

    2019-04-01 06:48

  • Browse the number:

    391

Send an inquiries

Company Profile

Shandong Binzhou Forging and Pressing Machinery Factory

By certification [File Integrity]

Contact:sdbzdyjx(Mr.)  

Email:

Telephone:

Phone:

Area:Shandong

Address:Shandong

Website:http://www.cndrillingrig.net/ http://sdbzdyjx.7unite.com/

Product Details

Product Description:

portable well drilling rig is designed by our engineers; it is truck mounted and is a rotary drilling rig. The truck chassis adopts the SINOTRUK brand 6X4 special crane chassis. The chassis is equipped with main drive, transmission power, gearbox, anchor unit, mud pump, sewage pump and mast.

Product parameters:

Technical parameter

Drilling depth(M)

300

Drilling diameter(mm)

500

Speed of turntable(r/min)

21.2;36;63.2;100.6;155;20.2(reverse)

Torque of turntable(KN.m)

18;10.6;6;3.8;2.5;18.9(reverse)

Single rope lifting capacity of windlass(KN)

30

The capacity of main windlass(KN)

180

Single rope lifting capacity of hydraulic windlass(KN)

40

The capacity of hydraulic windlass(KN)

160

The lifting capacity of hook(KN)

180

Bearing capacity of mast (KN)

180

The height of mast (mm)

11500

Bearing capacity (t)

25

Pipe

Kelly (mm)

108×108×7500

Assistant pipe (mm)

Ф89×10×5500



Hydraulic pump

Model

CB-HP50/32Z

Pump delivery (ml/r)

50/32

Rated speed (r/min)

2000

Rated pressure(MPa)

20








BW850/20

plunger pump

Diameter of cylinder (mm)

150

Stroke of piston (mm)

180

Theory of flow (L / min)

600 850

Rated pressure (Mpa)

3 2

Pounding times (min-1)

58 82

Diameter of suction tube (mm)

127

Diameter of drain pipe (mm)

64

Input speed (r / min)

470

Input power (kw)

40

Overall dimensions (mm)

2000*1030*1400

Weight (t)

1.5





Truck chassis

Model

TAZ5183TZJ

Drive form

6×4



Engine

Model

CA6DE3-20E3(Europe Ⅲemission standard)

Rated power(KW)

147

Speed (r/min)

2300

Size (L*W*H)(mm)

11110×2490×2500

Electric generator

Model

MF

Rated power (kw)

15

Rated voltage(v)

400

Rated current(A)

27

Speed (r/min)

1500

Frequency(Hz)

50

Protection level

IP21

Insulation Class

H

The best working gear (or speed)

5th gear(1000-1400r/min)

The highest speed(Km/h)

75

Weight (kg)

19340

Transport size(L*W*H)(mm)

12160*2490*3440

Working size(L*W*H)(mm)

11110*2490*13110


Features:

1)This rig is a rotary drilling rig with directional circulation, which is equipped with BW850/20 mud pump, It adopts the slurry as the washing fluid, it can drill on clay, sand and rock if it is equipped with a good drilling bit.

2)The power of drilling rig comes from the truck engine or individual diesel engine, the rig sets up distribute implement and hydraulic system.

3)We can set up the spare electric engine and clutch implement according to client's requirement, so that the rig can work with diesel engine or electric engine.

We can set up a generator (15kw) , so that it is convenience to illuminate or work at night.

4)The adding pressure implement is hydraulic, so it has a high efficiency when the rig drill on mud rock and weathering formation through using the adding pressure implement.

5)The master driving of rig is mechanical, the four jacks and mast are hydraulic operated. Distribute box, sewage pump, master driving clutch system are air operated.

6)The appearance of rig is pretty, it has a high efficiency because of having a larger torque of the turntable, it is mainly used for water well, construction, national defense building foundation, geological exploration, geothermic well and other foundation working, it is popular with domestic and foreign clients.

Precautions before using the product:

Installation of the unit:

1. Prepare the rock drilling space. The size of the space can be determined according to the type of chiseling and the method of chiseling.

2. Lead the gas and water (when water is required to remove dust) pipelines and lighting lines to the working point for use.

3. According to the design of the hole position, ensure the reliable positioning of the drilling rig. (with installation site map)

Second, the inspection before the operation:

1. When starting work, carefully check whether the pipelines are tightly connected to gas and water (when water is required for dust removal), especially the connection between the wind pipe joint and the wind pipe must be firm to prevent tripping and injury, and the joints are not allowed. There is a leak and water leakage.

2. Check if the oil mist is filled with oil (not too full).

3. Check whether the screws, nuts, joints, etc. of each part are tightened, and whether the various positioning is firm and reliable.

Packaging & Shipping

Usually Our Truck can be shipped by Ro-ro ship or Bulk ship or Container or Flat rack.

Packing Detail: Ro-Ro or Bulk base on the ship and port in your country. If the truck on the deck,we will spray antirust paint with free. Usually we will put the truck in cabin of the ship.

Delivery Details: 15-35 days after receiving 30% deposit

FAQ:

Q: I want to transport the truck by container, is it ok?

A: No, it isn’t . the transport size is 12500*2500*3750 mm, so we suggest to book the bulk ship or roll-on-roll-off ship.
Q:How about your product quality?

A: All our spare parts are from the original manufacturers, the quality is 100% guaranteed.
Q:I want to be your agent in my country , is that ok?

A:It’s ok, If your quantity is big, we will consider, for the first time 5 units.


__

http://www.cndrillingrig.net/